Pagsisimula: Ang Iyong Unang Production Order

Labing-limang minuto mula sa walang lamang module hanggang sa tapos na production order.

Panoorin ang Manufacturing flow tour (1:04). May isang tour ang bawat module sa Video Tutorials.

1. Set up ang factory (minsan)

Step 1  Admin → Manufacturing → Work Centers
        Create one work center per line/cell. Set daily capacity minutes.

Step 2  Admin → Manufacturing → BOMs
        Create a BOM for a product you make: output item + component lines.
        Publish a version (effective from today).

Step 3  (Optional) Routings
        Add operation steps with setup/run times per work center —
        the scheduler uses them; unrouted items still schedule fine.

Step 4  (Optional) Industry preset
        Pick a preset (food, pharma, electronics…) to auto-activate
        the compliance features your industry expects.

2. Patakbuhin ang daily flow

Demand arrives (order, forecast or manual signal)
   ↓
Planned order proposed (MRP)   →  firm it when you agree
   ↓
Production order created       →  release to the floor
   ↓
Issue materials from stock     →  WIP tracked automatically
   ↓
Record output (good/graded/by-products)
   ↓
Quality inspection (if the item's policy requires it)
   ↓
Complete the order             →  finished goods enter inventory,
                                  actual costs post to Accounting

Nagpapala ng live events ang bawat hakbang — nag-a-update ang mga dashboard at board sa real time para sa lahat ng nakakamasid.

3. Shortcut para sa maliit na tindahan

Laktawan ang planning sa kabuuan: Production Orders → New, pumili ng BOM, dami, at due date. Maaaring manatiling naka-off ang lahat ng iba (planning, scheduling, forecasting) hanggang kailangan mo ito.

Huling na-update: 11/22/2026