Introducción: Su Primer Pedido de Producción

Introducción: Su Primer Pedido de Producción

Quince minutos de un módulo vacío a un pedido de producción completado.

1. Configurar la fábrica (una vez)

Step 1  Admin → Manufacturing → Work Centers
        Create one work center per line/cell. Set daily capacity minutes.

Step 2  Admin → Manufacturing → BOMs
        Create a BOM for a product you make: output item + component lines.
        Publish a version (effective from today).

Step 3  (Optional) Routings
        Add operation steps with setup/run times per work center —
        the scheduler uses them; unrouted items still schedule fine.

Step 4  (Optional) Industry preset
        Pick a preset (food, pharma, electronics…) to auto-activate
        the compliance features your industry expects.

2. Ejecutar el flujo diario

Demand arrives (order, forecast or manual signal)
   ↓
Planned order proposed (MRP)   →  firm it when you agree
   ↓
Production order created       →  release to the floor
   ↓
Issue materials from stock     →  WIP tracked automatically
   ↓
Record output (good/graded/by-products)
   ↓
Quality inspection (if the item's policy requires it)
   ↓
Complete the order             →  finished goods enter inventory,
                                  actual costs post to Accounting

Cada paso activa eventos en vivo: los tableros y paneles se actualizan en tiempo real para todos los que están mirando.

3. Atajo para pequeñas empresas

Omitir la planificación por completo: Pedidos de Producción → Nuevo, elija el BOM, cantidad y fecha de entrega. Todo lo demás (planificación, programación, pronóstico) puede permanecer apagado hasta que lo necesite.